There is no standard figure, because the cost depends entirely on the carriage's condition, your site and how high you finish it — but the reliable rule is that conversion and siting usually cost more than the carriage itself, often several times more. The big line items sit on top of the purchase price: haulage and craneage to move and place the vehicle; groundworks and a base to stand it on; connecting services (water, power, drainage or treatment, sometimes off-grid); and the internal fit-out — insulation, heating, a kitchen, a bathroom, fixtures and finishes. Older stock may also need asbestos survey and removal, and any structural or weatherproofing repairs to the body. Site access is frequently the hidden cost driver: a plot a low-loader and crane cannot easily reach can make haulage and placement the single biggest expense. Because every project is different and there is no public price list, the sensible approach is to price each element for your specific carriage and site rather than rely on a headline number — and to build in contingency, since older vehicles reveal surprises once work starts. Running the figures properly before you buy is the difference between a profitable characterful let and an overspent restoration; a structured cost-and-feasibility exercise pays for itself here.
Sources: gov.uk
Related questions
Is conversion dearer than the carriage?
Usually yes — often several times more. Haulage, groundworks, services and fit-out typically outweigh the purchase price, so budget for the whole project, not just the body.
What drives the cost most?
Site access and services. A plot a low-loader and crane struggle to reach pushes up haulage and placement, and off-grid water, power and drainage add up quickly.
Ready to travel? Compare cabins and fares, then book with confidence.